(Glue-2411) Glue Extraction 2.0 Scheduler

It can be used to schedule and execute any extraction 2.0 process.

Common parameters:

  • Execution type: Only batch is allowed for EXT2 type. The Schedule button must be used to schedule the extraction before execution.

EXT2 specific parameters:

  • Package size: Input to specify the number of lines in MB for each extraction package.

  • Maximum number of jobs: Specify the maximum number of jobs that can run in the background.

  • Load Type: This parameter specifies the type of extraction load. If left blank, extractions are performed with the default mode specified for each extraction process. Possible entries:

EXT2_SEQ specific parameters:

  • Wait for sequence: Specify whether you want to wait for the current sequence to be processed before processing the next sequence.

  • Extraction sequence for extraction process: The sequence determines the order in which the extraction processes are executed.

image-20240524-082326.png

Create an EXT2 scheduler type:

  1. Click the Create button and enter a name and type for the scheduler.

     

  2. Fill in the parameters and schedule the execution type.

     

     

  3. Selection of extraction processes to be executed.

     

  4. Enter a variant for the extraction process or leave it blank. If the variant name was provided, there is a possibility to Overwrite variant.
    The values of the parameters Package size and Load type provided on the Scheduler screen will be used over the values of the identical parameters that the variant stores.

     

  5. Save and return to display mode.

  6. Execute scheduler.

  7. Result

     

The last run should be updated. The monitor can be used to check the status of executed extraction processes.

 

 In case of incompatibility load type of extraction process, data is not transferred. Extraction ends with the status Canceled.