(Glue-2311) Glue Trigger Scheduler
Glue Trigger Scheduler executes extractions that use SAP table fetcher based on Trigger delta. Selected Extraction processes are executed based on chosen settings. By default, if Glue triggers are not activated first, Full load and Delta Initialization are executed and then the delta replication will start. If you check the option to Skip initial full load, then only Delta loads will be executed.
Parameters
Package size (MB) | Size in MB of one package transferred during Extraction Process execution (used only if a variant is not set) |
Max number of jobs | Maximum number of jobs that can be used by the scheduler (scheduler job not included) |
Max jobs used for full loads (%) | Percentage of jobs that can be used for full loads (so the delta execution is not blocked for longer periods) |
Skip initial full load | When checking only delta loads will be executed |
ALV grid | List of Extraction Processes processed by the scheduler |
ALV Grid
Extraction Process: Name of Extraction Process object.
Variant (optional): When specified, the Extraction Process will be executed with the chosen Variant.
Trigger status: Status of triggers created on the source table.
Last start: Date and time of the last start of extraction.
Status: The icon is displayed in case the extraction is running.
Load mode: Load mode of the last executed extraction.