(Glue-2302) Glue Trigger Scheduler

Glue Trigger Scheduler executes extractions that use SAP table fetcher based on Trigger delta. Selected Extraction processes are executed based on chosen settings. By default, if Glue triggers are not activated first, Full load and Delta Initialization are executed and then the delta replication will start. If you check the option to Skip initial full load, then only Delta loads will be executed.

Parameters

Max number of jobs

Maximum number of jobs that can be used by the scheduler (scheduler job not included)

Max jobs used for full loads (%)

Percentage of jobs that can be used for full loads (so the delta execution is not blocked for longer periods)

Skip initial full load

When checking only delta loads will be executed

ALV grid

List of Extraction Processes processed by the scheduler

ALV Grid

Extraction Process: Name of Extraction Process object.

Variant (optional): When specified the Extraction Process will be executed with chosen Variant.

Trigger status: Status of triggers created on the source table.

Last run: Date and time of the last run of extraction.

Status: The icon is displayed in case the extraction is running.