Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

In the Datavard Validate Backend settings tab, you can manage parameters for Datavard Validate Backend test scenarios separately by 'Edit' button and customize reporting statuses as described in section 8.8.5 ('Reporting Status'). Parameters are divided into folders per test scenario. Individual settings are described in next subchaptersub-chapter

Image RemovedImage Added

Backend settings

...

  • Mass Execute Seq. Wait Time
    • Maximum number of seconds Datavard Validate waits for the test step to finish when the mass execution of the Test Cases is sequential.

...

For more information about "Scheduling Checker Settings" see the Test Plan Scheduling section, specifically Prerequisites part.
In section "Parameter Settings", various parameters regarding Test Management can be managed. Currently, one parameter "DISPLAY_TMPL_TYPE" is present, which states whether the Test Case types should be viewed in the Test Plan tab.


Image RemovedImage Added
Test Case types in Test Plans tab

In section "MS Word Templates", MS Word templates for Manual Test Case and for Status Document can be managed. If you upload more template documents, only the first document from the top of uploaded documents will be used. Therefore, therefore you need to delete the old template document before you attach a new one. (Tip: you can export document before deletion)

Image RemovedImage Added

In section "Other Settings", Test Case statuses can be managed.


Image RemovedImage Added
Test Management Settings

...

  • Excel settings: This setting is required because web pages are build by Java script, which loads cannot be determined and therefore we allowed a time out limit for a web page to load.
    • Excel time out limit

How long (in seconds) should excel should Excel look for a particular HTML element (table, tab on screen, etc.)

...

The number of times a test case is executed in case the case an execution ends with an error

...

BOBJ servers settings: in this option, you can define the server address, ports for BOBJ and provide a description. It is possible to specify several servers and also test directly the connection by clicking on Test connection.

Design studio settings:

...

It is a property of the Design Studio BOBJ document, which ensures that during a test case execution the scrolling in a document table works properly. To obtain the value of this property, go to the BusinessObjects Central Management Console > Applications and right click on in the context menu select the Design Studio Runtime > Manage Properties and copy the value of field Items Per Page into this setting.

Image RemovedImage Added

Front end settings

...

These settings are advanced and should be changes only after a consultation with Datavard.

  • Wait time in logon dialog load

Time in seconds after every change of a window, which is used to detect correct logon dialogs and fill the required fields. This setting is currently relevant for BEx testing.

...